C&G Commercial was selected for this fit-out for their proven track record in delivering high-quality finishes. We undertook an extensive scope of works to help bring Santander's new banking concept to life.
Scope of Works:
The project included a complete strip-out of the existing site, followed by substantial structural and architectural upgrades. Key elements of the fit-out included:
- Construction of a new auditorium and feature staircase
- Structural alterations
- Installation of solid and demountable partitioning
- Flooring and full interior decorations
- Installation of fire doors with relevant certification
- Supply of new bespoke furniture
- Fit-out of front and back-of-house Barista café areas
- Installation of new pavement lights
- Damp-proofing works
- Design and installation of HVAC and electrical systems
- New WC facilities
- Acoustic baffles and panel
- Security and access control systems
- Safe and ATM installations
Project Management:
C&G worked closely with the Santander Design Team to develop detailed construction drawings for all bespoke elements. This collaboration allowed for the agreement of a 20-week construction programme, aligning with the target Spring opening.
OUTCOME:
Thanks to a strong collaborative approach and effective communication with the client team, C&G successfully delivered the project on time and within budget. The result is a modern, high-specification Work Café that refelcts Santander's innovative approach to banking and customer engagement.